• Insights
  • Careers
  • Blogs
  • Contact Us
  • SgurrCares
Home Footer
  • About Us
  • BUSINESS SEGMENTS
    • Solar PV
    • Wind Energy
    • Floating Solar PV
    • Energy Storage
    • Hybrids & Microgrids
    • Green Hydrogen
    • Power System Studies
    • EHV Engineering
    • Environmental Engineering
  • ENERGY ADVISORY
    • Overview
    • Feasibility Studies
    • EPC Bid Management
    • Lender’s Independent Engineer
    • Transaction Advisory
    • Energy Storage
    • Plant Performance Assessment
    • Asset Monitoring
    • Environmental Engineering
  • DESIGN & ENGINEERING
    • Overview
    • Infrastructure Planning
    • Electrical Engineering
    • Civil and Structural Engineering
    • Detailed Engineering
    • Owner’s Engineer
    • EHV Engineering
    • Power System Studies
    • Flood Risk Assessment
    • Computational Fluid Dynamics
  • PROJECT MANAGEMENT
  • QUALITY ASSURANCE
    • Overview
    • Component Level Bankability studies
    • Construction Quality Assurance
    • PV Module Inspection
    • Balance of System Components
  • About Us
  • BUSINESS SEGMENTS
    • Solar PV
    • Wind Energy
    • Floating Solar PV
    • Energy Storage
    • Hybrids & Microgrids
    • Green Hydrogen
    • Power System Studies
    • EHV Engineering
    • Environmental Engineering
  • ENERGY ADVISORY
    • Overview
    • Feasibility Studies
    • EPC Bid Management
    • Lender’s Independent Engineer
    • Transaction Advisory
    • Energy Storage
    • Plant Performance Assessment
    • Asset Monitoring
    • Environmental Engineering
  • DESIGN & ENGINEERING
    • Overview
    • Infrastructure Planning
    • Electrical Engineering
    • Civil and Structural Engineering
    • Detailed Engineering
    • Owner’s Engineer
    • EHV Engineering
    • Power System Studies
    • Flood Risk Assessment
    • Computational Fluid Dynamics
  • PROJECT MANAGEMENT
  • QUALITY ASSURANCE
    • Overview
    • Component Level Bankability studies
    • Construction Quality Assurance
    • PV Module Inspection
    • Balance of System Components

Home Footer

Pennar Mumbai
Powerplant

Project Management

100 MW
commissioned

Detailed Engineering

Acciona
key-clients07
home-client08
Acwapower
adani green
home-client09
key-clients02
Aditya-Birla
Alfanar
Aljomaihholding
Amara-raja
Ameapower
Apraava
home-client11
Avaada
Azurepower
home-client12
Bagane
home-client13
Belectric
home-client14
Brookfield
bright-night
home-client15
Clean-Max
home-client16
cpp
Ditrolic-energy
key-clients14
home-client06
home-client17
enfinity
ENCL
home-client02
home-client18
home-client19
Fourthpartnerenergy
Frontier
home-client20
Global
Greenko
groupe
home-client22
Herofuture
home-client23
home-client24
home-client25
key-clients04
IEA
key-clients01
key-clients11
home-client26
Jakson
home-client27
home-client28
key-clients19
home-client29
home-client30
home-client31
key-clients06
key-clients20
key-clients16
home-client32
home-client33
Norfund
Norsk
home-client34
Parasenergy
key-clients09
home-client35
PIA
home-client10
key-clients17
home-client36
PWC
key-clients15
Radiance
home-client38
home-client40
home-client41
roha
home-client42
key-clients03
SB-Energy
Sekura
sembcorp
home-client43
key-clients05
home-client51
home-client44
home-client45
home-client46
home-client47
home-client48
home-client49
Solenco
SPRING
home-client50
STARCEMENT
home-client52
home-client53
home-client54
SUN
home-client55
home-client56
TATA-CLEANTECH
home-client57
key-clients18
TORRENTPOWER
VECTOR
home-client59
VIRESCENT
Voltas
home-client60

Blogs

September 6, 2023

Importance of layer wise backfilling and compaction test of soil for the plant infrastructure

Importance of layer wise backfilling and compaction test of soil for the plant infrastructure. There has been an increase in the number of projects being built worldwide in renewable energy sector. As the projected dates for commercial operation are pushed back by the project stakeholders, there is an increasing need to make speedy progress. The...

Read more
September 2, 2023

Navigating the Future: Climate Risk Assessment

Navigating the Future: Climate Risk Assessment In an era defined by the challenges of a changing climate, the imperative to anticipate and mitigate its potential risks has never been greater. As a forward-thinking organization committed to sustainable progress, SgurrEnergy recently embarked on a ground breaking Climate Risk Assessment study to illuminate the vulnerabilities that lie...

Read more
August 2, 2023

Climate Change Impacts and Adaptation- Framework for Flood Risk Analysis for Solar PV Plants

Climate Change Impacts and Adaptation- Framework for Flood Risk Analysis for Solar PV Plants Climate change significantly influences the precipitation pattern of the Area of Impact (AOI) for Solar Power Plants. This influence eventually poses risks to the power generation, inadequacy of the generating assets and damage to the associated infrastructure of the project. Hydrological...

Read more
June 23, 2023

Capacitor Banks or STATCOM for better Power Factor Correction

Capacitor Banks or STATCOM for better Power Factor Correction Capacitor Banks or STATCOM for better Power Factor Correction Reactive power compensation is an essential aspect of electrical power systems. Reactive power is the power that flows back and forth between the source and load without doing any useful work. It is required to maintain the...

Read more

News and Events

September 6, 2023

Importance of layer wise backfilling and compaction test of soil for the plant infrastructure

Importance of layer wise backfilling and compaction test of soil for the plant infrastructure. There has been an increase in the number of projects being built worldwide in renewable energy sector. As the projected dates for commercial operation are pushed back by the project stakeholders, there is an increasing need to make speedy progress. The...

Read more
September 2, 2023

Navigating the Future: Climate Risk Assessment

Navigating the Future: Climate Risk Assessment In an era defined by the challenges of a changing climate, the imperative to anticipate and mitigate its potential risks has never been greater. As a forward-thinking organization committed to sustainable progress, SgurrEnergy recently embarked on a ground breaking Climate Risk Assessment study to illuminate the vulnerabilities that lie...

Read more
August 2, 2023

Climate Change Impacts and Adaptation- Framework for Flood Risk Analysis for Solar PV Plants

Climate Change Impacts and Adaptation- Framework for Flood Risk Analysis for Solar PV Plants Climate change significantly influences the precipitation pattern of the Area of Impact (AOI) for Solar Power Plants. This influence eventually poses risks to the power generation, inadequacy of the generating assets and damage to the associated infrastructure of the project. Hydrological...

Read more

Recent Posts

  • Importance of layer wise backfilling and compaction test of soil for the plant infrastructure
  • Navigating the Future: Climate Risk Assessment
  • Climate Change Impacts and Adaptation- Framework for Flood Risk Analysis for Solar PV Plants
  • Capacitor Banks or STATCOM for better Power Factor Correction
  • Optimization of Pumped Storage Plant (PSP) with Wind-Solar Hybrids

Recent Comments

No comments to show.

Archives

  • September 2023
  • August 2023
  • June 2023
  • May 2023
  • April 2023
  • February 2023
  • October 2022
  • September 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022

Categories

  • Blog
  • Case Studies01
  • Events
  • PRESS RELEASE
  • Technical Articles
solar consultants in india
INDIA
solar power consultancy services
CHINA
solar power plant consultants
SAUDI ARABIA
UNITED STATES

About Us

  • Our Journey
  • Guiding Principles
  • Our Achievements
  • Client Testimonials

SgurrCares

BUSINESS SEGMENTS

  • Solar PV
  • Wind Energy
  • Floating Solar PV
  • Energy Storage
  • Hybrids & Microgrids
  • Hydrogen
  • Power System Studies
  • EHV Engineering
  • Environmental Engineering

ENERGY Advisory

  • Overview
  • Feasibility Studies
  • EPC Bid Management
  • Lender’s Independent Engineer
  • Transaction Advisory
  • Energy Storage
  • Plant Performance Assessment
  • Asset Monitoring
  • Environmental Engineering

Design & Engineering

  • Overview
  • Infrastructure Planning
  • Electrical Engineering
  • Civil and Structural Engineering
  • Detailed Engineering
  • Owner’s Engineer
  • EHV Engineering
  • Power System Studies
  • Flood Risk Assessment
  • Computational Fluid Dynamics

QUALITY ASSURANCE

  • Overview
  • Component Level Bankability studies
  • Construction Quality Assurance
  • PV Module Inspection
  • Balance of System Components

PROJECT MANAGEMENT

  • Overview
  • Engineering Coordination
  • Implementation Planning
  • Procurement Assistance
  • Execution Quality Management
  • On-site Material Management
  • Project Documentation
  • Construction Management
  • Administration Management
  • Change Management
  • HSE Management
  • Plant Testing & Commissioning Support
  • Plant Acceptance

Others

  • Blogs
  • Media and Events
  • Privacy Policy
  • Ethics & Code of Conduct
  • Terms & Conditions

CAREERS

INSIGHTS

CONTACT US

VelocitaBrand.com

Copyright © 2022 SgurrEnergy. All rights reserved.

Get in Touch!

  • Business Enquiry
  • Job Enquiry

Business Enquiry

    Job Enquiry

      IMS (ISO/IEC 17020:2012)

      SgurrEnergy has taken steps to implement the Inspection
      Management System in accordance with ISO/IEC
      17020:2012, as notified on 17.04.23. They are currently
      preparing for a certification audit with the National
      Accreditation Body NABCB, scheduled for the near future.

      The products being considered for certification include:

      • Solar PV Modules
      • Module Mounting Structure and Tracker System
      • Inverters
      • Transformers
      • Control and Relay Panel
      • HV/LV/ICOG Panels
      • Circuit Breaker and Isolators

      SgurrEnergy places great emphasis on maintaining impartiality
      and avoiding conflicts of interest during product inspections at
      vendor premises. SgurrEnergy is committed to impartiality and
      conflict of interest related to the product inspection at the
      vendor’s premises.









        Contact Experts Solar Show KSA

        Technical Details