• Insights
  • Careers
  • Blogs
  • Contact Us
  • SgurrCares
Visit Us At WETEX and Dubai Solar Show
  • About Us
  • BUSINESS SEGMENTS
    • Solar PV
    • Floating Solar PV
    • Energy Storage
    • Hybrids & Microgrids
    • Hydrogen
    • Power System Studies
    • EHV Engineering
    • Environmental Engineering
  • ENERGY ADVISORY
    • Overview
    • Feasibility Studies
    • EPC Bid Management
    • Lender’s Independent Engineer
    • Transaction Advisory
    • Energy Storage
    • Plant Performance Assessment
    • Asset Monitoring
    • Environmental Engineering
  • DESIGN & ENGINEERING
    • Overview
    • Infrastructure Planning
    • Electrical Engineering
    • Civil and Structural Engineering
    • Detailed Engineering
    • Owner’s Engineer
    • EHV Engineering
    • Power System Studies
    • Flood Risk Assessment
    • Computational Fluid Dynamics
  • PROJECT MANAGEMENT
  • QUALITY ASSURANCE
    • Overview
    • Component Level Bankability studies
    • Construction Quality Assurance
    • PV Module Inspection
    • Balance of System Components
  • About Us
  • BUSINESS SEGMENTS
    • Solar PV
    • Floating Solar PV
    • Energy Storage
    • Hybrids & Microgrids
    • Hydrogen
    • Power System Studies
    • EHV Engineering
    • Environmental Engineering
  • ENERGY ADVISORY
    • Overview
    • Feasibility Studies
    • EPC Bid Management
    • Lender’s Independent Engineer
    • Transaction Advisory
    • Energy Storage
    • Plant Performance Assessment
    • Asset Monitoring
    • Environmental Engineering
  • DESIGN & ENGINEERING
    • Overview
    • Infrastructure Planning
    • Electrical Engineering
    • Civil and Structural Engineering
    • Detailed Engineering
    • Owner’s Engineer
    • EHV Engineering
    • Power System Studies
    • Flood Risk Assessment
    • Computational Fluid Dynamics
  • PROJECT MANAGEMENT
  • QUALITY ASSURANCE
    • Overview
    • Component Level Bankability studies
    • Construction Quality Assurance
    • PV Module Inspection
    • Balance of System Components

September 2022

  • wpweb_sgurrenergy
  • Blog
  • September 22, 2022

Visit Us At WETEX and Dubai Solar Show

    WETEX and Dubai Solar Show 2022!

    Visit us at WETEX and Dubai Solar Show 2022!

    WETEX and the Dubai Solar Show, organized by the Dubai Electricity and Water Authority (DEWA), are in keeping with Dubai’s mission to develop a sustainable future for the Emirate and is held annually under the directive of HH Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE, Ruler of Dubai, and under the patronage of HH Sheikh Ahmed bin Saeed Al Maktoum, Chairman of the Dubai Supreme Council of Energy.

    Come and visit us at the Dubai World Trade Centre (DWTC) to learn more about our services.

    Schedule a 1-to-1 meeting with our team and visit our Stand No. – SS-K13, Hall No. – SS3 Indian Pavilion.

    We hope to see you soon in Dubai!

    Read More
    • wpweb_sgurrenergy
    • Blog
    • September 6, 2022

    SECI Tender

      SECI Tender

      SECI Tender: Stark Difference in Results and the Need of Curated Analyses

      SECI’s 500MW/1000MWh BESS Project was an ambitious tender floated that resulted in competitors bidding quotes that are poles apart. JSW Energy won the tender quoting a INR1.08 million/MW; on the other hand, the highest INR 2.29 million/MW offered by a seasoned player. The difference in quotes is more than 100%!

      This signals the fact that curated modelling, analyses, and optimization of BESS is crucial to gain a competitive edge in energy storage bids. Furthermore, inclusion of RE sources: wind and solar in recent BESS bids, which have high intermittency can affect the hybrid mix and cumulative capital costs.

      We help developers accurately size the hybrid mix: RE (PV + WIND) + BESS, by analyses of 20+ years’ time series data on a granular level for PV plants and Windfarms. 

      Figure below illustrates the variability of State of Charge (SoC) when coupled with RE to meet peak demand.

      We use 25-year simulations to optimally size batteries considering calendar and cyclic degradation profiles specific to OEM make and chemistry thereby removing uncertainties corresponding to “thumb rules” in BESS.

      Read More

      Recent Posts

      • Reactive Power based LCOE Analysis
      • Committed to Achieving the Global Vision of a Carbon-Neutral Planet
      • Visit Us At WETEX and Dubai Solar Show
      • SECI Tender
      • Optimization of Drainage Systems on Solar PV

      Recent Comments

      No comments to show.

      Archives

      • February 2023
      • October 2022
      • September 2022
      • April 2022
      • March 2022
      • February 2022
      • January 2022

      Categories

      • Blog
      • Case Studies01
      • PRESS RELEASE
      • Technical Articles
      solar consultants in india
      INDIA
      solar power consultancy services
      CHINA
      solar power plant consultants
      SAUDI ARABIA

      About Us

      • Our Journey
      • Guiding Principles
      • Our Achievements
      • Client Testimonials

      SgurrCares

      BUSINESS SEGMENTS

      • Solar PV
      • Floating Solar PV
      • Energy Storage
      • Hybrids & Microgrids
      • Hydrogen
      • Power System Studies
      • EHV Engineering
      • Environmental Engineering

      ENERGY Advisory

      • Overview
      • Feasibility Studies
      • EPC Bid Management
      • Lender’s Independent Engineer
      • Transaction Advisory
      • Energy Storage
      • Plant Performance Assessment
      • Asset Monitoring
      • Environmental Engineering

      Design & Engineering

      • Overview
      • Infrastructure Planning
      • Electrical Engineering
      • Civil and Structural Engineering
      • Detailed Engineering
      • Owner’s Engineer
      • EHV Engineering
      • Power System Studies
      • Flood Risk Assessment
      • Computational Fluid Dynamics

      QUALITY ASSURANCE

      • Overview
      • Component Level Bankability studies
      • Construction Quality Assurance
      • PV Module Inspection
      • Balance of System Components

      PROJECT MANAGEMENT

      • Overview
      • Engineering Coordination
      • Implementation Planning
      • Procurement Assistance
      • Execution Quality Management
      • On-site Material Management
      • Project Documentation
      • Construction Management
      • Administration Management
      • Change Management
      • HSE Management
      • Plant Testing & Commissioning Support
      • Plant Acceptance

      Others

      • Blogs
      • Media and Events
      • Privacy Policy
      • Ethics & Code of Conduct
      • Terms & Conditions

      CAREERS

      INSIGHTS

      CONTACT US

      VelocitaBrand.com

      Copyright © 2022 SgurrEnergy. All rights reserved.









        Contact Experts

        Technical Details