First 3D scanning Lidar deployed on FINO1

SgurrEnergy’s flagship product, Galion Lidar, was deployed last month on FINO1, Europe’s most established offshore met mast. Located in the German North Sea, the offshore research platform is equipped by German Wind Energy Institute, DEWI, with meteorological sensors to study the offshore environment.

The three month deployment of the Galion G250 Offshore model on the platform will primarily be used to measure the vertical profile of the wind. As the first 3D scanning Lidar to be deployed on FINO1, more advanced mast replacement scans can be trialled along with wind flow visualisation scanning. It is expected that the data acquired by Galion will be used to inform understanding of the conditions in which large offshore turbines operate.

The G250 Offshore model deployed on FINO1 is a short range unit and, within its 250m range, allows measurements to be made in any direction. Measuring to heights twice that of the FINO1 met mast will provide a data set that accurately represents wind flow across the entire span of the rotor.

The data collected by the Galion Lidar during the measurement campaign on FINO1 will not only contribute to impact assessments for potential offshore wind farms, but it can be used to verify the accuracy of the Galion compared to the met mast data.

Dr. Beatriz Cañadillas, from Research & Studies department at DEWI, said of the deployment: “We see the importance of wind Lidars in the offshore environment and we are looking forward to seeing the first comparison results”.

Richard Boddington, director of measurement and analysis for SgurrEnergy, which is part of Wood Group, commented: “The FINO1 mast is a great facility and we are excited to see the deployment of Galion for DEWI’s comparison study. We believe that Lidar devices offer the offshore industry a flexible, cost effective means for assessing offshore wind resource with significant impact on the operational success of projects. This deployment is a fantastic opportunity for SgurrEnergy to demonstrate the accuracy of Lidar technology in the offshore environment.”

We work in every corner of the globe
From solar farms to offshore wind farms, from Alaska to Mongolia; find out more about the projects that we work on globally

We have been impressed with SgurrEnergy’s service. They delivered great consultancy services within budget and to tight timescales for our Callian project, assisting us with our energy yield predictions for landmark solar PV transactions. I would not hesitate to recommend their strong solar team and consultancy services
Nadim Nehmé
Technical director
Eneryo
SgurrEnergy worked closely with UniCredit to identify critical issues and develop solutions to ensure all concerns of the banks were properly addressed. With the project under construction, the Sgurr team was very responsive to ensure that the analysis on the latest available information was provided to the banks. We thank all members of the SgurrEnergy team for significantly contributing to the success of the Lincs project.
Amit Dewan
Managing director
UniCredit Bank AG
As an engineering consultancy, SgurrEnergy has provided Cape Wind with a broad range of high quality technical support for the last two years. The work is consistently professional and timely. SgurrEnergy utilises a very effective combination of a local office for immediate support with backing from a much larger multifaceted organisation to fulfil a wide range of assignments on the Cape Wind project.
Craig Olmsted
Vice president- projects
EMI Energy
SgurrEnergy has provided a wide range of technical and environmental services in the development of the Salkhit project. We were delighted with the expertise made available to us and with the quality of work undertaken on our project. SgurrEnergy’s specialists have consistently identified and addressed project risks and have been instrumental in driving the project forward to financial close.
Neal Detert
Project manager
Clean Energy LLC
As the first wind farm project in Mongolia, the Salkhit wind farm represents a true landmark for Mongolia, and the birth of a vibrant renewable power industry in the country. The SgurrEnergy team has been instrumental in realising this project, providing professional and timely support from feasibility to due diligence and technical project management. We have relied greatly on the SgurrEnergy team’s experience and they have delivered.
Neal Detert
Project manager
Clean Energy LLC
SgurrEnergy’s specialists have consistently identified and addressed project risks and have been instrumental in driving the project forward to financial close
Neal Detert
Project manager
Clean Energy LLC
SgurrEnergy and WindMW worked closely together in identifying critical issues early and developing solutions in a quick and professional manner. That close cooperation not only produced a better project but it also enabled WindMW to close the financing in time to achieve the 2013 in-service date. We thank all members of the SgurrEnergy team for significantly contributing to the success of the Meerwind project.
Peter Giller
Director
WindMW
SgurrEnergy has been working closely with Moray Offshore Renewables, playing a fundamental role throughout the concept engineering process. Their expertise was indispensable in defining strategies and costs for our O&M work package. Against a very ambitious timescale their support and flexibility was essential in maintaining our decision making process.
Guilherme Mello Portugal
Civil and mechanical manager
EDP Renewables
 
© SgurrEnergy Ltd. 2012 | Registered in Scotland No. 245814 | Vat No. GB 797 0474 85
Privacy Policy | Terms and Conditions | Legal | Sitemap

Site design by fourtwentyseven | Site build by PoLR