17 July 2009
SgurrEnergy has been awarded a partially World Bank funded contract by the China Renewable Energy Scale-up Program (CRESP) to review and improve the wind measurement design reports produced by the Fujian Electric Power Survey & Design Institute (FIRM) for three wind farms. SgurrEnergy’s role in this project is to review the reports and suggest potential improvements to the methods, locations and configurations of the measurement campaigns.
© SgurrEnergy Ltd. Registered Office 225 Bath Street Glasgow G2 4GZ. Tel.: +44 (0)141 227 1700
Registered in Scotland No. 245814 Vat No. GB 797 0474 85