Biomass Feasibility Study
A full feasibility study was carried out for a biomass district heating system for a large country house and nearby offices. The study included a resource assessment, outline system design and selection of possible heat distribution, boiler and fuel store equipment.
Project Scoping for 50MWe Straw Fired Plant
SgurrEnergy is providing client support during project scoping for a 50MWe straw fired plant in Yangling province, China.
Electricity Generation form Distillery Waste
SgurrEnergy was commissioned to compare options and assess the feasibility of developing a bioenergy plant fuelled by distillery waste product. A planning application for this plant has been submitted.
HAZOP Studies for co-firing biomass
SgurrEnergy acted as Chairman and Secretary in HAZOP studies carried out for Longannet and Cockenzie power stations. The studies identified and eliminated safety issues resulting from the introduction of biomass fuel into these coal fired power stations. SgurrEnergy also project engineered and supervised the testing and commissioning of the Cockenzie installation.
Braemar District Heating Study
SgurrEnergy developed a detailed financial model to assess the economic feasibility of building and operating a community district heating scheme.
Biomass Quality and Availability Assessment
SgurrEnergy undertook a world wide study to assess the quality and quantities of potential sources of biomass arising in worldwide markets for use in co-firing or stand-alone biomass facilities in the UK.
© SgurrEnergy Ltd. Registered Office 225 Bath Street Glasgow G2 4GZ. Tel.: +44 (0)141 227 1700